琉璃瓦施工工程:
Construction project of glazed tile:
1、基层处理:将屋面按建筑要求做找平层,并做好防水处理。
1, grass-roots treatment: the roof will be flat according to the requirements of the building, and do waterproof treatment.
2、纵向放样:按照施工图,用墨线正确标出纵向铺瓦的间距,尽量在有效尺寸之内,调整到不切瓦为原则。
2: according to the construction plan, longitudinal sampling, correct spacing tiles with marked vertical line, as far as possible in the effective size, does not adjust to the principle of ceva.
3、铺瓦顺序:由檐口满面瓦→满面筒→光瓦→光筒向上铺贴→正线盾瓦→吻头→正脊→斜脊接正脊→收口或翘角嘴→瓦缝或脊缝搭色浆→全面清洁瓦面。
3, tile by tile, a cornice in order: a cylinder, light, light tube to be paved on the tile, tile, kiss, shield line head ridge, oblique ridge ridge to close or connected to the positive rake angle nozzle and tile seam or a paste, comprehensive clean seam ridge tile.
4、平脊安装,要求平直,斜脊要按图纸抛物线要求施工,弯度曲线要顺畅。
4, the installation requirements of flat, flat ridge, oblique ridge to construction drawings according to the requirement to the smooth curve of parabola, camber.
5、瓦片座垫水泥要饱满,不能砌筑后松脱。
5, the tile cushion cement should be full, and can not be loosed after masonry.
6、光筒砌筑要满浆,一个接一个要垂直,施工要用长木方条压平压直,瓦面曲线要顺畅。
6, the light tube masonry should be full, one after another to be vertical, the construction should be pressed and pressed straight with long wood square strips, and the curve of the tile surface should be smooth.
7、满面瓦安装要超出檐口5-6cm(满面瓦超出部位底部要扫白色),安装满面瓦时要在檐口垫高瓦嘴,保持瓦当滴水花板外垂直,略向外偏。檐口瓦要求出檐尺寸一致,瓦头高度相同,檐头整齐平直。
7, a tile installation to exceed 5-6cm (a position beyond the eaves tile bottom to sweep the white face in the installation), watt hour pad high eaves tile mouth, keep water flower plate vertical, slightly outwardly biased. The eaves tile eaves tile same size, same height, neat flat eaves.
8、瓦片铺贴要求搭接三分之二,要求平直,不能有疏密不一的现象。
8, tile paving needs to lap 2/3, the request is straight, can not have the phenomenon of density.
9、所有陶瓷瓦件,无论用任何方法,都须保证牢固地固定在屋面,而不允许出现任何脱离与移动的现象。
9. All ceramic tiles, in any way, must be firmly fixed on the roof, without any disengagement and movement.
10、清洁琉璃瓦面的灰浆,每天完工后及最后上色料工序后,要用干抹布抹干净瓦面,保持琉璃瓦面的清洁、光亮。
10, clean the glazed tile surface, after finishing every day and the last color process, wipe the tile surface with dry cloth, and keep the glazed tile surface clean and bright. |