1、古建琉璃瓦施工施工前操作人员必须熟悉工程设计要求及古建筑传统作法,校验施工部位的标高尺寸。
1, ancient glazed tile construction before the construction of the operating personnel must be familiar with the requirements of engineering design and ancient buildings traditionally, elevation dimension check of construction site.
2、古建琉璃瓦施工施工前应对琉璃构件逐块进行检查,所用构件应符合设计要求及有关规定。凡有裂缝、隐残及外观变形、掉釉者均应剔除不用。
2, ancient glazed tile construction before the deal with colored glaze by block check, the member should comply with the design requirements and the relevant provisions. Anyone who has cracks, hidden defects, appearance deformation and glaze missing should be eliminated.
3、搬运古建琉璃瓦施工时,应轻拿轻放,检查合格后须按构件种类、规格分别码放整齐备用。
3, handling ancient glazed tile construction, should be gently, after passing the examination according to the component types and specifications were neatly backup.
4、古建琉璃瓦施工是高处作业操作,施工前应认真检查脚手架。垂直运输要有专人指挥,遵守安全操作规程。
4, ancient glazed tile is the height of construction operation, construction should carefully check the scaffolding. Vertical transportation should be directed by special personnel and comply with safe operating procedures.
5、琉璃屋面一般应先做好古建琉璃瓦瓦面,然后再调脊,即“压肩”作法。
5, the general should first do a good job of ancient glazed roof glazed tiles, and then adjust the ridge, namely "shoulder press" approach.
6、完成部位应注意成品保护,翻拆脚手架时,须注意不得磕碰已完成的部位。2m以下的阳角和墙面应使用木板等材料妥善围护。
6, complete the site should pay attention to the protection of finished product, turn down the scaffolding, must pay attention to not bump the completed parts. 2m below the yang angle and the wall should use wood and other materials to properly protect.